Ask three studios to quote the same 3BHK and you will often get three numbers that are lakhs apart. Usually none of them is lying. They are pricing different things.
One quote might include the false ceiling and lighting. Another might list “light points” but not the lights. A third might quote a cheaper plywood without saying so. Until you know what each number covers, you can’t tell which one is actually cheaper.
This guide walks through an interior design quote line by line: what it should include, what is usually left out, and the questions that make two quotes comparable.
Estimate, BOQ and final bill: three different documents
Most homeowners use “quote” for all three, but they do different jobs.
- The estimate is a ballpark. It is based on your floor plan, the rooms you want done and a finish level. It tells you whether you are in the right range, not what you will pay.
- The BOQ (bill of quantities) is itemised. Every unit appears with its size, material, finish and rate. This is the document you compare.
- The final bill with working drawings is the version you sign. It locks measurements, specifications and the total before work starts.
At Chic Spaces, you get a tailored estimate within 24 to 48 hours of an Experience Centre visit. The final bill comes with working drawings and full material specifications, and it is presented before execution begins. Whoever you work with, don’t let carpentry start on an estimate alone.
What every line item should spell out
A good line item answers six questions. If one is missing, ask.
Size
Kitchen and wardrobe units are usually measured in running feet or square feet. The quote should give the measurement for each unit, not just a lump sum per room.
Core material
At Chic Spaces, we follow a standardized approach by using one consistent core material across all furniture in the home, irrespective of its application — from wardrobes and kitchen units to shutters and storage cabinets. While some companies use different materials for different furniture elements, we maintain a uniform material standard throughout the home. The details are outlined in our Material Specifications section.
Outer and inner finish
The outside finish could be laminate, acrylic, PU paint or veneer. The inside of cabinets usually gets a thinner liner laminate. Both should be named, with thickness where it applies.
Hardware
Hinges, drawer channels, lift-up mechanisms and handles. “Branded hardware” is not a specification. Ask for the brand and the type, for example soft-close hinges or full-extension drawer channels.
Edge banding
The strip that seals the exposed edges of a board. It matters more than it sounds: poor edge banding is where moisture gets in and laminates start to lift.
Rate and basis
Is the rate per square foot, per running foot or per unit? Rates on different bases can’t be compared directly.
Here is what the difference looks like in practice:
| Vague line | What it should say |
|---|---|
| Kitchen base units | Base units, 10 running ft, 16 mm BWP plywood carcass, 1 mm laminate outside, 0.8 mm liner inside, soft-close hinges, 3 full-extension drawers |
| Master wardrobe | Hinged wardrobe, 7 ft x 8 ft with loft, 16 mm BWR plywood, acrylic shutters, soft-close hinges, 2 drawers, 1 hanging rod |
| False ceiling, living | Gypsum false ceiling, 220 sq ft, with cove for profile light, includes paint |
What is usually included
A full-home interior quote typically covers:
- Modular kitchen units, often with the countertop
- Wardrobes and lofts
- TV unit, crockery unit, shoe rack and pooja unit
- Study units and storage in kids’ rooms
- False ceilings with labour
- Wall panelling and partitions, where designed
- Transport, installation and site supervision
- Design, 3D views and working drawings
Even within this list, check every room. It is common for a quote to include the master bedroom wardrobe but leave out the third bedroom, or to include the TV unit but not the back panel behind it.
What is often left out
These are the items that turn a ₹20 lakh quote into a ₹26 lakh project. None of them is a trick on its own. The problem is finding out late.
- Appliances: hob, chimney, built-in oven and microwave, dishwasher
- Sink and faucet in the kitchen
- Light fixtures. “Light points” means wiring, not the lights themselves
- Electrical changes: new switch points, rewiring, a bigger distribution board
- Plumbing changes: moving a sink or adding a water purifier point
- Civil work: breaking a wall, changing tiles, waterproofing
- Painting of walls and ceilings
- Loose furniture: sofa, dining table, chairs, sometimes beds
- Curtains, blinds and rods
- Deep cleaning before you move in
- GST. On interior works it is commonly charged at 18%. On a ₹20 lakh project that is ₹3.6 lakh, so check whether the number you are comparing includes it
Our post on planning your home interiors on a realistic budget covers how to set money aside for these.
Five ways quotes become hard to compare
- Different units. One studio quotes per square foot of carpet area, another per running foot of units. Convert both to a per-room total before comparing.
- Unnamed grades. If one quote says BWP and another says “water-resistant”, you are not comparing like with like.
- Lump sums. “Kitchen package: ₹X” hides the size, the material and the hardware. Ask for the breakdown.
- Provisional amounts. Some quotes carry a placeholder for items like lighting or stone “to be finalised”. Ask what the placeholder assumes.
- Design fee hidden or separate. Some firms fold design into the rates, others charge it separately. Either is fine, as long as you know which.
Questions to ask before you sign
- Is this the final bill, or an estimate that will change after design?
- Which items in my home are not in this quote?
- What happens to the price if I change a finish during the project?
- Is GST included?
- Are appliances, lights, sink and faucet included or excluded?
- Who pays for electrical and plumbing changes?
- What warranty covers the carcass, the hardware and the finish?
- Will I see and approve the actual materials before they are used?
If a studio is uncomfortable answering any of these in writing, that tells you something.
How payment terms connect to the quote
A clear quote is only half of it. The payment schedule decides how much risk you carry.
Be careful with schedules that ask for most of the money before work is visible. A fairer structure ties each payment to a stage you can see on site. Chic Spaces uses six milestone payments, so you pay as work is completed rather than in advance. Whatever schedule you agree, make sure each payment names the stage that triggers it.
How Chic Spaces approaches quotes
We built our process around one idea: you should know the full number before work starts.
- A tailored estimate within 24 to 48 hours of your visit
- A final bill with working drawings and material specifications before execution
- Materials you select and sign off, from our own Material Gallery in Hyderabad
- Six milestone payments tied to work completed
- One year of free service after handover
You can read more about how we work or why transparency matters to us. If you already have a quote from another studio, bring it to our Experience Centre. We are happy to walk you through what it covers.
Frequently asked questions
What should an interior design quotation include?
Every unit with its size, core material and grade, outer and inner finish, hardware brand and type, edge banding and rate. It should also list what is excluded, such as appliances, lights, civil work and GST.
What is a BOQ in interior design?
A bill of quantities. It is an itemised list of every unit and material in your project, with sizes, specifications and rates. It is the best document for comparing two studios.
Why do interior quotes for the same flat vary so much?
Mostly because they price different things: different materials, finishes, hardware and scope. Once every quote is broken down to the same items and grades, the gap usually narrows.
Is GST included in interior design quotes?
Not always. Ask directly. On interior works GST is commonly charged at 18%, which makes a large difference to the final total.